Data Centre Cost reduction initiatives, corporate mandates, as well as space, budget, and uptime planning require detailed asset information to achieve corporate objectives.
Capacity planning is an integral part of any data center operation and presents some of the most important, and challenging questions data center teams face. Do we have the right people and tools in place? Can we maintain uptime while maximizing computing resources? How do we keep our projects on time without increasing cost or risking outages?
Facilitating Data Centre Cabling and Troubleshooting
With the flow of data rising exponentially, data center space and efficiency have become premium factors for businesses. All hardware and cabling designs must be modular and scalable, make optimal use of space and take cooling and energy consumption concerns into account.
Gone are the days of using point-to-point cabling and directly connecting devices to one another. This leads to cabling messes and increases cabling costs for every hardware refresh. In today’s high-density data center, a well-designed structured cabling system increases uptime, scalability and return on investment while simultaneously decreasing your technology footprint and operating expenses.
General Overview of DCIM as a Service
The pandemic has Increased the need to work from home and minimize onsite staff. Social distancing and restrictions on how many staff members can be onsite are now commonplace. With Data Centre access being extremely limited, management of the Data Centre must be done effectively and remotely.
Managing Data Centre Operations
In recent years, data centre infrastructure has become significantly more reliable and management practices have improved, so it would be fair to expect that the number of reported downtime incidents is decreasing. But this is not the case.
According to a 2018 survey by Uptime Institute, 31% of respondents experienced a downtime incident or severe degradation in the last year and 48% reported at least one outage at their site or at a service provider in the last three years.
Managing Data Centre Operations
Good network documentation practices improve uptime and increase the speed at which you can deploy equipment. Plus, if there is an issue, you can quickly trace cables via your documentation to determine the root cause rather than having to manually trace cables. Without proper documentation, you risk mismanagement of resources, ineffective use of capacity, inability to move or install equipment, unsafe operating environments, and increased capital expenditures for new cabling and hardware.
Managing Data Centre Operations
Sunbird DCIM software provides Data Centre operations managers with the ability to identify, locate, visualize, and manage all physical Data Centre assets, quickly provision new equipment, and confidently plan capacity for future growth. Sunbird DCIM software also helps control energy costs, improve Data Centre design, and increase operational efficiency.
As colocation environments grow increasingly dense and complex, you need to accurately inventory and track individual physical port types residing on every device to make the most informed decisions to improve planning for new equipment and services and aid in maintaining and troubleshooting colocation infrastructure.
“A lot of times I’m in a meeting and there’s a project coming up and we’re going to deploy some new equipment and we want to know what we have for connectivity,” said Tom Wysocki, Data Center Manager, KPMG. “What I’m able to do is bring up a visual of that switch and very quickly I can highlight what’s connected and what’s not connected. So if we’re in a project and I know there’s going to be ten servers and I’m going to need two connections per server, I can see I’ve got plenty of ports available and even assign those out now to the network team or the project leader and say, ‘These are the ports we’ll be utilizing,’ so they can go ahead and start getting them configured. We can start pre-cabling ahead of time and labeling and really move ahead on that project.
December 10, 2020
In 2020, data center professionals saw significant industry shifts and advancements in data center management tools that reshaped how modern data centers are managed. The COVID-19 pandemic ushered in a new normal requiring remote data center monitoring and management, which was already becoming a priority due to increases in edge, retail, colocation, and remote deployments.